Chick Fil A
N Dale Mabry Tampa, FL

Job Description: -2” PVC underground conduit from the property line as indicated to the edge of the building. Stub up as close to building as possible. Include an E LOC coupling connection to HDPE if necessary (cold weather locations). -Conduit requires tracer wire from the property line to the building and pull tape from the property line to the install point. -Riser should be metallic liquid tight. GPR and 811 Scan was done.